ClueBot NG Report Interface

// Report

Navigation

ID:1066623
User:Millermk90
Article:COCOMO
Diff:
m (Reverting possible vandalism by 115.108.54.16 to version by 117.225.36.234. False positive? Report it. Thanks, ClueBot NG. (1066623) (Bot))
Line 1: Line 1:
  +
{{db-g12}}
 
The '''Constructive Cost Model''' ('''COCOMO''') is an algorithmic [[Estimation in software engineering|software cost estimation model]] developed by [[Barry Boehm|Barry W. Boehm]]. The model uses a basic [[Regression analysis|regression]] formula with parameters that are derived from historical project data and current project characteristics.
 
The '''Constructive Cost Model''' ('''COCOMO''') is an algorithmic [[Estimation in software engineering|software cost estimation model]] developed by [[Barry Boehm|Barry W. Boehm]]. The model uses a basic [[Regression analysis|regression]] formula with parameters that are derived from historical project data and current project characteristics.
   
Reason:
Your username:
Reverted:Yes
Comment
(optional):

Note: Comments are completely optional. You do not have to justify your edit.
If this is a false positive, then you're right, and the bot is wrong - you don't need to explain why.