ClueBot NG Report Interface

// Report

Navigation

ID:1618495
User:95.172.74.38
Article:Portland School (Worksop)
Diff:
(the principal has changed so i have updated this)
(Merger with Hartland)
(Tag: possible BLP issue or vandalism)
Line 53: Line 53:
   
 
== Merger with Hartland ==
 
== Merger with Hartland ==
In late 2003 the decision was made to merge the school with the Hartland secondary school which was north and next door to Portland school. This merger happened in 2004 though not without concerns by some parents [http://www.worksopguardian.co.uk/news/local-news/moving_pupils_in_is_a_recipe_foe_disaster_say_portland_parents_1_637193]. The merge with the Hartland site created a site with: three canteens, two science blocks, two assembly halls, three outdoor sports courts including two large barn buildings, three fields including one large field equivalent to 9 football pitches.
+
In late 2003 the decision was made to merge the school with the Hartland secondary school which was north and next door to Portland school. This merger happened in 2004 though not without concerns by some parents [http://www.worksopguardian.co.uk/news/local-news/moving_pupils_in_is_a_recipe_foe_disaster_say_portland_parents_1_637193]. The merge with the Hartland site created a site with: three canteens, two science blocks, two assembly halls, three outdoor sports courts including two large barn buildings, three fields including one large field equivalent to 9 football pitches. This caused gangs as well as racial and group rape
   
 
== Move to New Site ==
 
== Move to New Site ==
Reason:ANN scored at 0.960213
Your username:
Reverted:Yes
Comment
(optional):

Note: Comments are completely optional. You do not have to justify your edit.
If this is a false positive, then you're right, and the bot is wrong - you don't need to explain why.